Engine_v3.2 — Live Operations
2,847

Material matches today

14.3

Avg. days saved / project

$2.1M

Cost overruns prevented this week

98.6%

Inspection pass rate on AI specs

▶ Run Your First Recommendation

No account required. Upload a spec sheet or enter a project address.

Interactive Explorer

Select your project type.
Watch the engine work.

AI Material Recommendations

4 matches

Ready-Mix Concrete 4000 PSI

ASTM C94 / ACI 318

97

MATCH

saves 4 days

Grade 60 Rebar #5 Bundle

ASTM A615

94

MATCH

saves 2 days

LP SmartSide Panel 16OC

ICC-ES ESR-1301

91

MATCH

saves 6 days

Owens Corning R-38 Batt

IECC 2021 §R402

89

MATCH

saves 1 day

Schedule Compression

13wks saved
Site Prep
Foundation
Structural
Envelope
MEP Rough
Baseline
Engine Optimized

Risk Flags

Supplier lead time 8 wks on HVAC units — flag for substitution

Fire-blocking spec gap in Floor 4 penetrations

Flags update as site conditions change

Active Profile

Multifamily Residential

Schedule gain31%
Weeks saved13 wks
Matches found4 specs
▶ Run Your Recommendation

Schedule Compression

31%FASTER

vs. unoptimized schedule

Supplier Intelligence

The engine already knows which supplier
won't let you down at 6 AM on pour day.

Supplier Reliability Heatmap

Low
Med
High
96Southeast

Vulcan Materials

Lead: 3 days · Pass: 99.1%

94Mid-Atlantic

Martin Marietta

Lead: 4 days · Pass: 98.7%

91Southwest

US Concrete

Lead: 2 days · Pass: 97.4%

88Northeast

Quanta Precast

Lead: 6 days · Pass: 96.2%

85Gulf Coast

Cemex USA

Lead: 5 days · Pass: 95.8%

83Mountain West

Summit Materials

Lead: 7 days · Pass: 94.1%

Vulcan

Martin

US

Quanta

Cemex

Summit

Cost Comparison — Ready-Mix Concrete

$112/yd³
Engine Pick
$138/yd³
Alt. A
$157/yd³
Alt. B
Engine Pick: ASTM C94 compliant
Alt. A: +$26/yd³ over budget
Alt. B: +$45/yd³, 9-day lead

"Engine flagged a concrete supplier substitution on the Meridian Tower job — 11 days before pour. That flag alone saved us a failed inspection and a 3-week remediation. Our PM called it the best $8,000 we ever spent."

DK

Derek Kowalski

Senior Estimator · Holloway Construction Group, Chicago

Failed inspection avoided
Remediation weeks saved3 wks
Net cost saved$340K

Compliance Engine

Every spec auto-checked against code.
Before the inspector shows up.

Auto-Populated Code Checklist

5/6 passing1 flag

Inspection Pass Rate

98.6%

on AI-recommended specs

1.4s

Avg. flag response

0.02%

Breach rate

47%

Fewer RFIs

Faster submittals

"Engine caught a fire-blocking gap in our Type III framing before the rough-in inspection. That's a $220K remediation we didn't have to do."

SR

Sandra Reyes

PM · Apex Build Group, Dallas

Ready to run compliance on your specs?

Upload a project spec sheet — Engine auto-populates every applicable code check in under 90 seconds.

▶ Run Your Recommendation

"I run Engine before every submittal package. It cut my review time from 6 hours to 40 minutes. At 11 PM on a Thursday, that's the difference between going home and not."

MO

Marcus Okonkwo

Lead Estimator · Cornerstone Pacific, Seattle

"We manage 14 active sites. Engine is the first tool that actually talks to all of them at once — one dashboard, every material flag, every schedule risk, in real time."

PM

Priya Mehta

VP Construction Operations · Greystone Development, NYC

No form. No sales call. Just results.

The math was right
before the first pour.

Upload a spec sheet or enter a project address. Engine surfaces material matches, flags compliance gaps, and compresses your schedule — in under 2 minutes.

2,847

Material matches / day

14.3

Avg. days saved per project

$2.1M

Cost overruns prevented this week

98.6%

Inspection pass rate

No account required · Results in <2 min · Used by 3,500+ GCs nationwide